00
%

POWERING
WHAT MATTERS.

Skip to content Skip to footer

Every great project needs power players.
We’re proud to be one.

We don’t build the grid — we strengthen its backbone.

Some connections light up cities. Ours keep them standing. Every clamp, connector, and fitting we supply carries the weight of trust and the precision of purpose. While we may not lay the foundations or raise the towers, our work holds it all together — silently, reliably, and relentlessly.

From stabilizing grids to empowering transmission, Legion Energy products form the spine of some of the most critical power projects across India and the world. Because real strength isn’t always visible — but it’s always felt.

Below is a showcase of some key projects where Legion Energy played a vital role through the supply of high-performance components and solutions:

Connecting continents, the KEC way.

For KEC International Limited, Legion Energy supplied a comprehensive range of hardware, clamps, and connectors tailored for 400/225/132/33 kV systems. These precision-engineered components were delivered to 10 countries, including Bhutan, Nepal, Gambia, Nicaragua, Tanzania, Togo, Senegal, Ivory Coast, Burundi, and Burkina Faso — reinforcing transmission networks across continents.

This project stands as a testament to our commitment to delivering global-standard solutions that strengthen power infrastructure wherever energy flows.

Powering L&T’s vision across Africa and Asia.

From Asia to Africa, L&T Construction’s transmission projects demanded strength, reliability, and scale. To meet this, we supplied high-quality hardware, clamps, and connectors for 400, 220, and 132 kV lines across countries like Kenya, Bangladesh, Nepal, Uganda, and more.

When L&T lays the groundwork for global energy, we ensure every connection holds strong.

From Ghana to Nigeria, MBH builds. We bond it.

To support MBH Power’s growing energy infrastructure across West Africa—including Ghana, Kabba, Liberia, and Nigeria — we delivered robust 330/132 kV hardware, clamps, and connectors engineered for reliability and scale.

When MBH leads the charge for electrification, we ensure every fitting holds strong, powering futures across the region.

Kalpataru’s global reach, secured by our hardware.

To support Kalpataru Projects International Ltd’s expansive transmission projects across continents — from Guyana to Gitega, Tunisia to Tanzania — we supplied high-performance 500/225/161/90 kV hardware, clamps, and connectors.

No matter the destination or voltage, our products deliver strength, reliability, and seamless integration — powering Kalpataru’s global grid with confidence.

Sterling projects, powered by precision.

To support Sterling and Wilson Pvt. Ltd.’s global transmission initiatives in Bangladesh, Jordan, and Chile, we supplied high-quality 400/230/132 kV hardware, clamps, and connectors.

Behind every international milestone is a foundation of reliability — and our components help ensure the power flows, wherever it’s needed.

Jakson’s global reach, backed by cardinal strength.

Jakson Limited turned to us for their international transmission needs across Nepal, Saudi Arabia, and Uzbekistan. We supplied Cardinal hardware rated for 220/132 kV — designed to endure, engineered to perform.

Because when reliability travels across continents, every component counts.

Elevating energy in Tajikistan — with GENSER.

GENSER GENEL MÜH. TAAH. partnered with us to support their 500 kV transmission needs in Vose and Rudaki, Tajikistan. Our high-performance hardware played a key role in enabling the project’s strength, reliability, and future-readiness.

Because precision isn’t just built into our hardware — it’s built for every place it powers.

50,000 km of accessories supplied to Reliance Jio through HTL.

Successfully delivered 50,000 kilometers of ADSS cable accessories to Reliance Jio through HTL, ensuring timely execution and strict adherence to quality standards.

Supplying strength for KEI’s 33kV mission in Gambia.

For KEI Industries’ transmission project in Gambia, Legion Energy supplied 148 sqmm AAAC hardware for the 33kV line. The project demanded precision, performance, and durability—values we delivered with every fitting. Because even local grids need world-class components.